• If you have bought, sold or gained information from our Classifieds, please donate to HomeBrewTalk and give back.

    You can become a Supporting Member which comes with a decal or just click here to donate.

Missouri Electric brewery ebiab control panel

Homebrew Talk - Beer, Wine, Mead, & Cider Brewing Discussion Forum

Help Support Homebrew Talk - Beer, Wine, Mead, & Cider Brewing Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

mike_777

Well-Known Member
Joined
Jun 13, 2010
Messages
70
Reaction score
2
Location
Kansas City
Parting out my ebiab setup. Was going to give to my brew partner, but he doesn't have space for it. I'll create a new thread for the major components as I have time. This one is for the control panel itself:

Runs off of a 30amp gfci service. Auber PID controller, nema receptacles for pump and heating element, auber switches, 40a ssr/heatsink, will include 30amp plug wire for connection.

Will also throw in Auber RTD probe.

$400 shipped

jrAqqA7.jpg
 
do you have a wiring diagram ? Something that PJ made ?
do you have some better photos ?
- connectors
- interior


Interested !
thanks
 
Back
Top