virgil1
Well-Known Member
What was you final cost for the build minus you brew pot? How many hours do you think you had in putting it together? I am looking at building a system similar to yours.
I added it all up again.
$400 for all panel and electrical (not counting having an electrician install 240V near my work bench. Our dryer is gas, so no 240V in garage already)
$280 for chugger pump + silicone tubing and all of the SS Camlock connectors from bargain fittings.
$240 in other misc tools and the kettle. $90 for the kettle. Then I bought hole saws, step bit, some files and and the knockout punch($90 for that)
I have most of the costs listed in the thread, but here they are all together:
Panel and electrical
----------------------
11.99 dryer cord
11.49 locking plug
21.25 BUD box
47.92 4 auber buttons
46.5 auber PID
7.86 auber buzzer
14.40 sheet metal insert for BUD
19.28 2 contactors
8.50 fuse holders
5.55 terminal strip - large
3.71 terminal strip - ground
12.98 14 G wire(50 ft)
12.99 10G wire(25 ft)
6.39 #6 spade terminals
5.99 female disconnect terminals
4.99 #8 spade terminals
7.38 jumpers (2)
14.99 240V Inlet
13.11 240V Receptacle
26.00 hotpod
37.00 element
32.99 cord for heating element
6.39 SSR heat sink
20.00 SSR
$399.65
Tools
---------
12.26 Step bit
6.09 Files
88.95 Kettle
41.03 Hole Saws
90.94 Knockout punch
$239.27
Pump
----------
28.20 Silicone Tubing 10 ft 1/2" ID, 3/4" OD
120.62 Bargain Fittings
132.89 Chugger pump
$281.71