TheBigWeave
New Member
- Joined
- Feb 6, 2013
- Messages
- 1
- Reaction score
- 0
I have recently started malting my own grains. I am just looking for some feed back, when drying I use 42x36 racks with mesh on the bottom. Spread the grains on them. I am doing 50 pounds at a time. I use 3 racks so roughly 15 lbs on each. I put the racks in my furnace room that is roughly 85 to 90 on any given day. I also have an industrial dehumidifier in the room. It still took 2 days to dry the grains. Is this normal?