Good morning all,
I had the pleasure of making a sweet stout this weekend and all went well util 12 hours into fermentation. 1.080 OG responded well to 2 packets of s-33. I pitched at 67 deg into a well aerated wort into my 7 gal. SS brew bucket. Had activity about 3 hours later to my surprise.
By the next morning she was super active. Now, I have a temp control system to monitor ferm temps and keep them consistent but for some reason this time I didn't use it.
Skip ahead to midday and the temps are up to 78 deg due to all the activity. This is where I start to worry and kicked myself for not using my chiller.
I had the bright idea of sanitizing the coil on my other brew bucket lid, quickly changed it over and set the temps on my regulator to bring it down to 70. When it got to 70 about 20-30 mins later fermentation continued for another 2 hours or so and then everything stopped. Before leaving work this morning I checked again and not a single indication that fermentation is still going. When I get home I plan to do some gravity readings but I have a feeling I screwed up either way. Either the yeast burned through the entire batch already because of the temps, or I effectively stopped fermentation with the somewhat drastic change in temps. I guess my question is if I haven't reached expected FG over the next few days do i attempt to re-pitch or leave it be and see how it turns out?
I had the pleasure of making a sweet stout this weekend and all went well util 12 hours into fermentation. 1.080 OG responded well to 2 packets of s-33. I pitched at 67 deg into a well aerated wort into my 7 gal. SS brew bucket. Had activity about 3 hours later to my surprise.
By the next morning she was super active. Now, I have a temp control system to monitor ferm temps and keep them consistent but for some reason this time I didn't use it.
Skip ahead to midday and the temps are up to 78 deg due to all the activity. This is where I start to worry and kicked myself for not using my chiller.
I had the bright idea of sanitizing the coil on my other brew bucket lid, quickly changed it over and set the temps on my regulator to bring it down to 70. When it got to 70 about 20-30 mins later fermentation continued for another 2 hours or so and then everything stopped. Before leaving work this morning I checked again and not a single indication that fermentation is still going. When I get home I plan to do some gravity readings but I have a feeling I screwed up either way. Either the yeast burned through the entire batch already because of the temps, or I effectively stopped fermentation with the somewhat drastic change in temps. I guess my question is if I haven't reached expected FG over the next few days do i attempt to re-pitch or leave it be and see how it turns out?