Hauntedyards
Well-Known Member
- Joined
- Jan 16, 2012
- Messages
- 104
- Reaction score
- 1
I want to automate/control the banjo burner by using the Auber 1/16 DIN PID Temperature Controller and an ASCO solenoid valve for the propane. Maybe add a timer or two.
Would there be any point in utilizing the ramp/soak version in a one pot brew structure to control the various stages of the mash cycle?
Would there be any point in utilizing the ramp/soak version in a one pot brew structure to control the various stages of the mash cycle?