BSBrewer83
Well-Known Member
Here are some pictures of my almost complete brew shed. It should be up and running shortly. I will be brewing under the vent on the right. I will test out the amount of moisture to see if I will need to put any more ventilation.
The left side of the shed will be used as storage. I will upload more pics when I actually get the brewing gear in and in use.
[/ATTACH][/ATTACH]
The left side of the shed will be used as storage. I will upload more pics when I actually get the brewing gear in and in use.
[/ATTACH][/ATTACH]