Hey Guys!
I've been on a major brewing hiatus, but I'm finally getting back. I'm moving my rig indoors (woohoo!) and making it electrict (bigger woohoo).
I'm hoping to validate some decision before starting the purchasing/building phase.
Here's a quick link to my parts list:
https://docs.google.com/spreadsheets/d/1lj92kJ8X_xBP6FwYp6P-DoUqd9Hb7LqjSFC34KVvHe0/edit?usp=sharing
One thing to note is at the request of my wife I will need to have this thing key locked.
I also was hoping I could get a quick validation of my wiring diagram. Something feels fishy about the location of the key switch.
Thanks in advance for any feedback!
I've been on a major brewing hiatus, but I'm finally getting back. I'm moving my rig indoors (woohoo!) and making it electrict (bigger woohoo).
I'm hoping to validate some decision before starting the purchasing/building phase.
Here's a quick link to my parts list:
https://docs.google.com/spreadsheets/d/1lj92kJ8X_xBP6FwYp6P-DoUqd9Hb7LqjSFC34KVvHe0/edit?usp=sharing
One thing to note is at the request of my wife I will need to have this thing key locked.
I also was hoping I could get a quick validation of my wiring diagram. Something feels fishy about the location of the key switch.
Thanks in advance for any feedback!