Hello all
Long time trolley new poster. About to start my keggle build Monday. Been gathering information for weeks. Starting with the boil kettle, what amount of bungs do I need? They are all going to be welded and I have plans for a single tier herms setup in the near future. So far on my list is=
1" for electric element
1/2" for bottom drain valve
1/2" for top fill valve
1/2" thermowell
I thought about adding a float switch. Am I missing anything? Let me know. Thank you in advance.
Long time trolley new poster. About to start my keggle build Monday. Been gathering information for weeks. Starting with the boil kettle, what amount of bungs do I need? They are all going to be welded and I have plans for a single tier herms setup in the near future. So far on my list is=
1" for electric element
1/2" for bottom drain valve
1/2" for top fill valve
1/2" thermowell
I thought about adding a float switch. Am I missing anything? Let me know. Thank you in advance.