If Pol were here, he'd leave again because you've seriously out-blinged him! Damn fine work DeeDub76.
Thanks!!!! I'm not sure though...his setup was really nice!
ScubaSteve I have been contemplating adding a drain because I am concerned with contaminents growing if not fully drained. Consider a low point drain installed. Thanks for your input.
Love your build so far!
I am inspired by the fact that I am seeing more small breweries being setup for 3g batches. What are your plans for fermenters? Size? Type? Are you planning on bottling or kegging?
Wiring job is top notch! The hardlined plumbing is sweet too. How much longer until you plan on firing that bad boy up?
Well last night the rig came to life! I ran some water tests to qualify it. No leaks, pump worked awesome, and elements operated smoothly. The PID's need calibrated and some additional setup. Timer still needs connected to buzzer/indicator. But, in all, it was a great feeling seeing my creation come to life.
Is it just me or has anybody else got nervous and held their breathe the first time they flipped the power switch?!!
View attachment 21510
Well last night the rig came to life!
I think I would feel like Dr. Frankenstein running around the laboratory..umm brewery and yelling:
It's Alive! It's Alive!
A lot less than you think! The majority of it has come from the dumpster at my work.