Okay so here we go...
side by side fridge to fermentation chamber... this should only take 1 week max to finish, so lets say 2 total weeks... I already have the temperature controller and I have already fermented in it, its just time to step it up a tad bit....
as a kegerator...
as a fermenter...
Here's what I did today...
I knocked out the middle wall leaving behind a huge mess, which, by the way, is a pain to clean up. As you can see I ripped everything off the door on the right as well and plan to get to the freezer door tomorrow. Hopefully if everything goes as planned I will have the temperature controller where the water and ice dispensers are...
anyway. more to follow. I am a very visual learner and if you are two I hope this can help ya some
side by side fridge to fermentation chamber... this should only take 1 week max to finish, so lets say 2 total weeks... I already have the temperature controller and I have already fermented in it, its just time to step it up a tad bit....
as a kegerator...
as a fermenter...
Here's what I did today...
I knocked out the middle wall leaving behind a huge mess, which, by the way, is a pain to clean up. As you can see I ripped everything off the door on the right as well and plan to get to the freezer door tomorrow. Hopefully if everything goes as planned I will have the temperature controller where the water and ice dispensers are...
anyway. more to follow. I am a very visual learner and if you are two I hope this can help ya some