Just want to make sure I have everything in order before setting up the plan. Is there anything else I should get?
So I don't have the chest freezer yet nor do I have the tap handles (have the first two planned), but I plan on a 7.1 cubic foot layout. I also am deciding on the type of digital thermostat I will use...imbedded or free-standing)
I have purchased:
2 new Perlicks
1 new Flow Control Perlick
1 Taprite Dual Body Regulator (I don't have the bard, will this one work for 5/16 http://www.homebrewstuff.com/1-4-mal...b-fitting.html)
1 Taprite Four-Body Secondary Regulator
1 gauge guard
3 ft. red gas tubing to connect the regulators
1 mini-wireless dehumifior
1 200 mm fan (don't have the power connections yet)
3 hex nuts for the beer shanks
1 keg charger (emergency backup)
1 CO2 tank leak stopper
1 32mm carbonator and PET growlers
I will purchase:
5 ball lock liquid connectors (two for a future filter project)
3 rubber washers
3 stainless steel shanks @ 4"
1 28mm carbonator
a few stainless steel worm clamps (not into O-clamps)...do I need any for the shanks?
4 5/16 gas line assemblies @ 3'
3 Stainless Steel Tail Piece 1/4" Barb x 3/16" ID
Liquid tubing
1 10lb CO2 tank
3 AEB kegs
So I don't have the chest freezer yet nor do I have the tap handles (have the first two planned), but I plan on a 7.1 cubic foot layout. I also am deciding on the type of digital thermostat I will use...imbedded or free-standing)
I have purchased:
2 new Perlicks
1 new Flow Control Perlick
1 Taprite Dual Body Regulator (I don't have the bard, will this one work for 5/16 http://www.homebrewstuff.com/1-4-mal...b-fitting.html)
1 Taprite Four-Body Secondary Regulator
1 gauge guard
3 ft. red gas tubing to connect the regulators
1 mini-wireless dehumifior
1 200 mm fan (don't have the power connections yet)
3 hex nuts for the beer shanks
1 keg charger (emergency backup)
1 CO2 tank leak stopper
1 32mm carbonator and PET growlers
I will purchase:
5 ball lock liquid connectors (two for a future filter project)
3 rubber washers
3 stainless steel shanks @ 4"
1 28mm carbonator
a few stainless steel worm clamps (not into O-clamps)...do I need any for the shanks?
4 5/16 gas line assemblies @ 3'
3 Stainless Steel Tail Piece 1/4" Barb x 3/16" ID
Liquid tubing
1 10lb CO2 tank
3 AEB kegs