cridden
Member
I am trying to move from my current BIAB setup in a keggle with propane outside to a simple electric setup in my basement, and would appreciate some advice.
I am working with a very limited budget, but I also have very few needs. I want to go 240v using my dryer hookup, and I have no plans for a pump at the moment. My house is also rented, so I cannot do anything permanent.
I will be getting a 5500w element for the keggle, and have no problem installing and potting that, and I have an ammo box that will work fine for an enclosure, so I guess I just need advice on what I need to economically control mash temps, and control boil. I am only doing 5 gallon batches, but would like to go 240v for shorter heating times, etc.
Being new to the electric world, i would like to keep wiring and bells and whistles to a minimum...I just want to make some beer indoors
Any help would be greatly appreciated.
I am working with a very limited budget, but I also have very few needs. I want to go 240v using my dryer hookup, and I have no plans for a pump at the moment. My house is also rented, so I cannot do anything permanent.
I will be getting a 5500w element for the keggle, and have no problem installing and potting that, and I have an ammo box that will work fine for an enclosure, so I guess I just need advice on what I need to economically control mash temps, and control boil. I am only doing 5 gallon batches, but would like to go 240v for shorter heating times, etc.
Being new to the electric world, i would like to keep wiring and bells and whistles to a minimum...I just want to make some beer indoors
Any help would be greatly appreciated.