Gab1788
Well-Known Member
Hi all,
I'll be doing my first double batch tomorrow as I just got my four ring 75,000 BTU burner.
I have a 70lt BK and only a 26lt HLT and my mash cooler tun is apx 40lt.
My question is this, can I mash with 10 kg of base ( not sure on specialties yet but won't be heaps) with 26 lt of strike. Sparge with 26 lt then sparge again with what ever I need to get to pre boil. I was thinking maybe another 10 to 15 lt?
Will this work fine? This isn't my first AG batch so I'm not freaking out, just looking for some pointers or better methods that will work with my system.
Thanks in advance.
Gab.
I'll be doing my first double batch tomorrow as I just got my four ring 75,000 BTU burner.
I have a 70lt BK and only a 26lt HLT and my mash cooler tun is apx 40lt.
My question is this, can I mash with 10 kg of base ( not sure on specialties yet but won't be heaps) with 26 lt of strike. Sparge with 26 lt then sparge again with what ever I need to get to pre boil. I was thinking maybe another 10 to 15 lt?
Will this work fine? This isn't my first AG batch so I'm not freaking out, just looking for some pointers or better methods that will work with my system.
Thanks in advance.
Gab.