I'm not doing anything ground breaking but wanted to share my build so far.
I cut the molded shelving brackets out and covered the cuts with a couple layers of aluminum tape.
I wanted to keep the C02 tank outside so it could be changed out easier and used to purge carboys and kegs. I mounted the air distributor in the upper left corner, and drilled a hole in the lower left part of the hump for the 2.5" threaded pipe and 5/16" barb x 1/4" female NTP on top and bottom.
I still need to run the shanks through the door and mount the faucets.View attachment ImageUploadedByHome Brew1459106368.683532.jpgView attachment ImageUploadedByHome Brew1459106490.985373.jpg
I cut the molded shelving brackets out and covered the cuts with a couple layers of aluminum tape.
I wanted to keep the C02 tank outside so it could be changed out easier and used to purge carboys and kegs. I mounted the air distributor in the upper left corner, and drilled a hole in the lower left part of the hump for the 2.5" threaded pipe and 5/16" barb x 1/4" female NTP on top and bottom.
I still need to run the shanks through the door and mount the faucets.View attachment ImageUploadedByHome Brew1459106368.683532.jpgView attachment ImageUploadedByHome Brew1459106490.985373.jpg