EdWort
Well-Known Member
Detail work is probably 40% of the total time value of a project.
Yep. I'll have it completely caulked by the weekend. I'm getting in two tubes in the morning before getting ready for work. This morning was not too bad, but the forecast is 98 degrees for the rest of the week. The heat has made a difference.
Now it's time for the big ladder to the the front and back overhangs. I'm glad I went with white paintable caulk as I can see what been done so far.