AkBrew907
Well-Known Member
- Joined
- Jan 27, 2015
- Messages
- 621
- Reaction score
- 196
Decided to start a thread to gather some thoughts, post a couple pictures of what I have to work with and track the progress over this summer as things come together.
Bought a new to us place in December and was thrilled when I realized it had a room in the basement that already has 240V wired (use to be a hot tub room). If this wasn't a sign to switch to electric I don't know what is.
Below are a couple pictures of the room in it's current state. Well kinda, it's full of shipping boxes and totes but this was before we moved all that crap in there.
Plan to rip the shelves they had in there out, replace the trim and build a custom bench, stand, storage etc along with a freezer for fermentation control and another one I will convert into a keezer.
I have a google sketchup drawing of my anticipated design I will load up once home. Looking for input on layout and flow.
Bought a new to us place in December and was thrilled when I realized it had a room in the basement that already has 240V wired (use to be a hot tub room). If this wasn't a sign to switch to electric I don't know what is.
Below are a couple pictures of the room in it's current state. Well kinda, it's full of shipping boxes and totes but this was before we moved all that crap in there.
Plan to rip the shelves they had in there out, replace the trim and build a custom bench, stand, storage etc along with a freezer for fermentation control and another one I will convert into a keezer.
I have a google sketchup drawing of my anticipated design I will load up once home. Looking for input on layout and flow.