flanneltrees804
Well-Known Member
Alright, for one reason or another my friend has asked me to piece together, price out and hopefully build a small pilot system in the vein of Kal's. It will use old 1/2bbl kegs and the control panel will be purchased directly from Kal as I have no intention (or ability) to design my own. Most of the system will be DYI as I and the guy funding this are quite handy.
I will be posting updates and pictures as they come in but I wanted to get everyone's input on the cost of the build. The link is to a spreadsheet where I have laid out all the costs I can think of as pertains to simply building this thing so please look over it and let me know what I left out and if my cost estimates are too high or low.
Let the dialogue begin!
https://docs.google.com/spreadsheet/ccc?key=0Al2cbHiLEcZ0dEoxWmEta2xtMm9ncHRqbHBZWGtySlE
I will be posting updates and pictures as they come in but I wanted to get everyone's input on the cost of the build. The link is to a spreadsheet where I have laid out all the costs I can think of as pertains to simply building this thing so please look over it and let me know what I left out and if my cost estimates are too high or low.
Let the dialogue begin!
https://docs.google.com/spreadsheet/ccc?key=0Al2cbHiLEcZ0dEoxWmEta2xtMm9ncHRqbHBZWGtySlE