Well after looking at alot of rigs on here and borrowing ideas from too many members to list I started working on my Space Saver Gravity 3 tier brew rig
stage 1: top two tiers will be 16 X 36 and everything will be able to stack on to store away in a minimum space
http://www.flickr.com/photos/61340080@N04/5647493340/in/photostream
Next step was to mount top burner
http://www.flickr.com/photos/61340080@N04/5646930061/in/photostream
Then I added the piping for the gas lines
http://www.flickr.com/photos/61340080@N04/5700428553/in/photostream
Thats as far as I got with the rig so far but I did leak test my brew pot Keggle and Mash Tun and I have a little tweeking to do with the top burner. Next is to make the HLT Keggle and the bottom burner. So far it is turning out great.
Thanks for all the great info and ideas from the members
stage 1: top two tiers will be 16 X 36 and everything will be able to stack on to store away in a minimum space
http://www.flickr.com/photos/61340080@N04/5647493340/in/photostream
Next step was to mount top burner
http://www.flickr.com/photos/61340080@N04/5646930061/in/photostream
Then I added the piping for the gas lines
http://www.flickr.com/photos/61340080@N04/5700428553/in/photostream
Thats as far as I got with the rig so far but I did leak test my brew pot Keggle and Mash Tun and I have a little tweeking to do with the top burner. Next is to make the HLT Keggle and the bottom burner. So far it is turning out great.
Thanks for all the great info and ideas from the members