Complete setup .Three e-keggle bottom drain Herms PID controlled pilot system. Everything you need but ingredients and fermenter. It runs on 220v and requires a 30 amp GFI breaker. The control panel is one on PJs designs.
The system works great I just dont get to use as often as I like so Im down-sizing . I would prefer to sell it as a complete system, but may consider separating the keggles from the control panel. Id keep the control panel to use on my next set up.
Includes:
3 keggles (Hot Liquor tun, Mash tun and Boil)
Hot liquor tun includes a 50ft stainless steel coil (HERM)
Mash tun includes a stainless steel false bottom
Control panel with Auber PID
2 March Pumps
Quick connects and hoses
40 plate chiller
Asking $2,000. I'd prefer a local sale
The system works great I just dont get to use as often as I like so Im down-sizing . I would prefer to sell it as a complete system, but may consider separating the keggles from the control panel. Id keep the control panel to use on my next set up.
Includes:
3 keggles (Hot Liquor tun, Mash tun and Boil)
Hot liquor tun includes a 50ft stainless steel coil (HERM)
Mash tun includes a stainless steel false bottom
Control panel with Auber PID
2 March Pumps
Quick connects and hoses
40 plate chiller
Asking $2,000. I'd prefer a local sale