Yes, there are probably 50 threads on this, but I'd like some guidance for my specific application. Here's my plan:
Single Tier 10 gallon HERMS
- 3 keggles, two with full false bottoms
- eBK 5500w ULWD RIPP
- eHLT 5500w ULWD RIPP
- 2 March 809 pumps
- HLT has SYL-2352 controlling eBK element via 40A SSRD
- BK has SYL-2352 controlling eHLT element via 40A SSRD
- MLT has SYL-2352 to show actual temperature in MLT
- countdown timer
- RTD probes @ HLT, MLT, BK, and wort out of HLT HEX
- 3-piece ball valves
Here are some shots of my basement. I'm planning on using my existing 240V outlet for my dryer. There is also hot and cold water spigots as well as a dryer vent right beside it, so it seems like the best place for a eHERMS
Any help would be appreciated, thanks guys!
Single Tier 10 gallon HERMS
- 3 keggles, two with full false bottoms
- eBK 5500w ULWD RIPP
- eHLT 5500w ULWD RIPP
- 2 March 809 pumps
- HLT has SYL-2352 controlling eBK element via 40A SSRD
- BK has SYL-2352 controlling eHLT element via 40A SSRD
- MLT has SYL-2352 to show actual temperature in MLT
- countdown timer
- RTD probes @ HLT, MLT, BK, and wort out of HLT HEX
- 3-piece ball valves
Here are some shots of my basement. I'm planning on using my existing 240V outlet for my dryer. There is also hot and cold water spigots as well as a dryer vent right beside it, so it seems like the best place for a eHERMS
Any help would be appreciated, thanks guys!