Sawdustguy
Well-Known Member
I started planning my RIMS Brewery build and posted this thread: Two Tier System Build. The thread contained my system design schematic, the RIMS heater build and Control Panel build. This post is an update and report on my system build. As of today all I have to do is mount the three pumps, plumb and wire the system.
To reiterate, I bought the stand to a Brew Magic system for $900. It was worth every penny. Yes, I weld, but it would have taken forever to build a stand because I would rather sit on my fat, lazy, Polish ass and drink beer. Ah, there were a couple of business trips thrown in there also. I have all the parts so unfortunately for me I have no excuses to use for slow progress.
With out further ado here are some pictures:
To reiterate, I bought the stand to a Brew Magic system for $900. It was worth every penny. Yes, I weld, but it would have taken forever to build a stand because I would rather sit on my fat, lazy, Polish ass and drink beer. Ah, there were a couple of business trips thrown in there also. I have all the parts so unfortunately for me I have no excuses to use for slow progress.
With out further ado here are some pictures: