Working on building a NG fired brutus 10 type system and am just getting around to working on a wiring diagram for my control panel. The system will have three Honeywell VR8200 valves, two controlled by Auber SYL-2362 PID's. The boil kettle will be controlled via a switch on the control panel (no need for a PID there).
I've also implemented P-J's e-stop and two alarm switches for the PID's that will control a 24VAC flashing buzzer.
My main questions are:
-Do I have fuses where I need them, and should I put one on the gas valves?
-Am I running the wiring efficiently enough by running some stuff in parallel?
-Do I actually have these PID's wired correctly for PID relay control, with J2 as my temp alarm?
-Should I use that many terminal blocks, or does anyone have any better ideas?
Thanks in advance!
I've also implemented P-J's e-stop and two alarm switches for the PID's that will control a 24VAC flashing buzzer.
My main questions are:
-Do I have fuses where I need them, and should I put one on the gas valves?
-Am I running the wiring efficiently enough by running some stuff in parallel?
-Do I actually have these PID's wired correctly for PID relay control, with J2 as my temp alarm?
-Should I use that many terminal blocks, or does anyone have any better ideas?
Thanks in advance!