dpalme
Well-Known Member
Ok, we have a bathroom that I had previously gutted, was going to redo it and we tore out the old dry wall, replaced the aluminum wiring, etc., I have finally received permission to put in whatever I want for my brewing!!!
The only problem is the room size is 5x6.5, now I can take out the two inside walls without any problems and open it up into the rest of the room and probably use a LITTLE of the office space, but not much with all my camera and video equipment.....
My question is, is this enough room? I can hook a burner up to the gas line and run it off natural gas, vent it for heat and fumes, and I already have water right there.....as for the toilet, no problem, we can just plug that over and its history....
This is what the room looks like:
ok the scetch I drew didn't work. I've attached a PDF with the layout.
I thought about taking out wall A and moving into the office by about 2 feet and building a bar to separate the cooking area from the office....
Thoughts? Or should I just wait until we find the property in the country and build that final home and add a place out back to do the brewing.....
View attachment room layout.pdf
The only problem is the room size is 5x6.5, now I can take out the two inside walls without any problems and open it up into the rest of the room and probably use a LITTLE of the office space, but not much with all my camera and video equipment.....
My question is, is this enough room? I can hook a burner up to the gas line and run it off natural gas, vent it for heat and fumes, and I already have water right there.....as for the toilet, no problem, we can just plug that over and its history....
This is what the room looks like:
ok the scetch I drew didn't work. I've attached a PDF with the layout.
I thought about taking out wall A and moving into the office by about 2 feet and building a bar to separate the cooking area from the office....
Thoughts? Or should I just wait until we find the property in the country and build that final home and add a place out back to do the brewing.....
View attachment room layout.pdf