Tankard
Well-Known Member
How do you start the process? If you are supposed to keep 1 inch of water above the grain bed at all times, how can this be achieved if the outflow matches the inflow from the HLT? Are you supposed to open the valve on the HLT, wait until there is enough water above the grainbed, and then open the valve on the mash tun?