- Joined
- Feb 17, 2010
- Messages
- 14,612
- Reaction score
- 3,600
After too long planning, buying, etc... I couldn't wait any longer. I'm still waiting to order the 23 tip burners, my 10g cooler has yet to arrive, and I have been too busy to convert my other keggle and build a stand, so I decided last weekend that I WAS going to brew an AG batch. Today is my third batch, and it's boiling away as I type, so I thought I'd give everyone a chuckle at my creation.
It consists of two car ramps, two jack stands, two 6' pieces of 1-1/4" steel tubing, a 38k btu water heater burner/gas valve brazed onto one of the pieces of steel tubing, a 5g cooler mash tun with ss braid, march pump, and homemade cfc, misc other parts, and a "bobby_m" gas supply line.
Enjoy!
It consists of two car ramps, two jack stands, two 6' pieces of 1-1/4" steel tubing, a 38k btu water heater burner/gas valve brazed onto one of the pieces of steel tubing, a 5g cooler mash tun with ss braid, march pump, and homemade cfc, misc other parts, and a "bobby_m" gas supply line.
Enjoy!