chrismac676
Member
Time for me to toss out / re-purpose my collection of pots, buckets, and burners and build a real brew rig. I'll chronicle each step of the build here and plan to be finished within a few months max. Right now it's time to nail down plans.
I've already purchased a BCS-462 box and happen to have an old EloTouch touchscreen computer laying around. These will control heat, pumps, and maybe valves.
I also have two 1/2 barrel kegs, so these will be modified as my MLT and BK.
I should have easy access to power (I know I have a 50a breaker that's not in use), but we'll get to those requirements down the road.
Beyond that, I'm leaning toward a hybrid RIMS/HERMS system. More on that next.
I've already purchased a BCS-462 box and happen to have an old EloTouch touchscreen computer laying around. These will control heat, pumps, and maybe valves.
I also have two 1/2 barrel kegs, so these will be modified as my MLT and BK.
I should have easy access to power (I know I have a 50a breaker that's not in use), but we'll get to those requirements down the road.
Beyond that, I'm leaning toward a hybrid RIMS/HERMS system. More on that next.