BrewinBuckeye
Member
I have been brewing for a little while now, and I would like to build an AG system this summer. Since I have plenty of time I would like to get some things in a row. I would like to build a control box, I have seen a lot of posts about wiring and everything, but is there a good thread out there that explains everything you need in the box for a PID and what not. I saw electric brewings website but thats a little more fancy than what i need. Id like a heating element in my HLT and Boil, with pumps and all.
Any input??
Thanks in advance.
Any input??
Thanks in advance.