spidiracer
New Member
- Joined
- Nov 29, 2012
- Messages
- 3
- Reaction score
- 0
Hi everyone,
I have gotten so much good information from all of you that I decided it was time to join! I have currently started my first Keezer build!
I purchased a 7.2 cu ft Frigidaire Chest Freezer for around $250. I shopped at several online stores to get all the other stuff I need. One of my primary goals in building this is to make sure that its portable. I am trying to keep things light so that two people can easily move it. More on that later.
I decided to building everything out of Alder because I really enjoy all of the character. Its very soft wood so that also helps make it easy to work with.
Here is a pic of most of the stuff all laid out:
I'm using Perlick 525SS faucets with 4" SS shafts. I also purchase a love controller, the TS2. Ordered new tubing, clamps, all that jazz. Here is where I am at now:
I'm waiting to pick up a custom cut piece of alder for the top, I will get that tomorrow. My plan is to replace the lid with a custom top and coffin. I'm confident about putting everything together but I am unsure on how to wire the TS2. I have been looking at some of the threads in the forum here, hopefully i can get that figured out. I should have all this done by next Friday!
Stay tuned and thanks for all of your help so far!
I have gotten so much good information from all of you that I decided it was time to join! I have currently started my first Keezer build!
I purchased a 7.2 cu ft Frigidaire Chest Freezer for around $250. I shopped at several online stores to get all the other stuff I need. One of my primary goals in building this is to make sure that its portable. I am trying to keep things light so that two people can easily move it. More on that later.
I decided to building everything out of Alder because I really enjoy all of the character. Its very soft wood so that also helps make it easy to work with.
Here is a pic of most of the stuff all laid out:
I'm using Perlick 525SS faucets with 4" SS shafts. I also purchase a love controller, the TS2. Ordered new tubing, clamps, all that jazz. Here is where I am at now:
I'm waiting to pick up a custom cut piece of alder for the top, I will get that tomorrow. My plan is to replace the lid with a custom top and coffin. I'm confident about putting everything together but I am unsure on how to wire the TS2. I have been looking at some of the threads in the forum here, hopefully i can get that figured out. I should have all this done by next Friday!
Stay tuned and thanks for all of your help so far!