I've been planning my build for a few months and now finally have most of the parts and I'm ready to go.
Single tier stand with two 50L sanke kegs.
HLT has two 120V 2000W elements installed
I have two separate 20A circuits in my garage
Both kegs have valves installed
I have a PID
I have two 40A...