ok all...
I am finally to the gas plumbing part. After 3 trips to lowes...thank god they are only 1 mile down the street...I think I may have a design. completely different from what I had originally planned. I was already going to hard plumb the small center burner. I am also thinking of now hard plumbing the two larger burners too. i cant find a 1/2" to 1/2" NPT needle valve....one side is flared. i mean it fits but how wrong is that to do? Before I go BACK to lowes again...i used this handy little thing called a ... tape measure....but i also wanted to get the valves i have returned and get what I do need. I also have a problem with actually mounting to manifold. i forgot to mention this to my dad :cross:
with it being steel i am assuming i really need a serious drill or a self drilling screwing....i havent talked to him yet about it.
I am finally to the gas plumbing part. After 3 trips to lowes...thank god they are only 1 mile down the street...I think I may have a design. completely different from what I had originally planned. I was already going to hard plumb the small center burner. I am also thinking of now hard plumbing the two larger burners too. i cant find a 1/2" to 1/2" NPT needle valve....one side is flared. i mean it fits but how wrong is that to do? Before I go BACK to lowes again...i used this handy little thing called a ... tape measure....but i also wanted to get the valves i have returned and get what I do need. I also have a problem with actually mounting to manifold. i forgot to mention this to my dad :cross:
with it being steel i am assuming i really need a serious drill or a self drilling screwing....i havent talked to him yet about it.