Im building a CFC modeled after the one in the tutorial posting, but im not sure if i want to make 2 x 25ft or just 1 at 50'.
if i do it at 50' can i just open up the valve completely and let er rip and have it cooled quicker or would it just be a waste? I was thinking of just trying to sell the second one to pay for the first but i dont know.
I want to start working on my stand. Ive been planing my system upgrade for after my wedding and I really liked the sculpture systems from morebeer.com. I was wandering where would be the best place to find/scavange/buy cheep the angle iron or steel that I would need to build a stand?
I have the design laid out and its pretty simple.. i just have to start scavaging for metal little bits at a time.
if i do it at 50' can i just open up the valve completely and let er rip and have it cooled quicker or would it just be a waste? I was thinking of just trying to sell the second one to pay for the first but i dont know.
I want to start working on my stand. Ive been planing my system upgrade for after my wedding and I really liked the sculpture systems from morebeer.com. I was wandering where would be the best place to find/scavange/buy cheep the angle iron or steel that I would need to build a stand?
I have the design laid out and its pretty simple.. i just have to start scavaging for metal little bits at a time.