• If you have bought, sold or gained information from our Classifieds, please donate to HomeBrewTalk and give back.

    You can become a Supporting Member which comes with a decal or just click here to donate.

California Fully Automated HERMS Setup

Homebrew Talk - Beer, Wine, Mead, & Cider Brewing Discussion Forum

Help Support Homebrew Talk - Beer, Wine, Mead, & Cider Brewing Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

alk907

Member
Joined
Jan 26, 2012
Messages
10
Reaction score
1
Location
Los Angeles
Hi guys, just moved to Los Angeles, California and have no room to finish/set this back up. It is just sitting in storage disassembled, so I figured I would see if anyone is interested.

I started this project earlier this year and is 90% complete. It is based on this setup here https://www.oscsys.com/projects/brewtroller/system-design/recirculated-mash-2-tier

The kettles are all 18 gallon, EVERYTHING is stainless steel/silicon tubing This is a 50amp setup and can run both 5500 watt heating elements for the boil kettle and HLT at the same time. Pumps are chugger, and the chiller is a therminator. I have only ran 2 batches through this setup in its previous state.

Equipment that will be included but is not setup yet.
-Volume sensors
-Status lights/buzzer/volt meter on the control panel.


I would like to get $2500 PM or email me for more details if you are interested ([email protected])

IMG_0152.jpg


IMG_1260.jpg


IMG_2414.jpg
 
Back
Top