alk907
Member
Hi guys, just moved to Los Angeles, California and have no room to finish/set this back up. It is just sitting in storage disassembled, so I figured I would see if anyone is interested.
I started this project earlier this year and is 90% complete. It is based on this setup here https://www.oscsys.com/projects/brewtroller/system-design/recirculated-mash-2-tier
The kettles are all 18 gallon, EVERYTHING is stainless steel/silicon tubing This is a 50amp setup and can run both 5500 watt heating elements for the boil kettle and HLT at the same time. Pumps are chugger, and the chiller is a therminator. I have only ran 2 batches through this setup in its previous state.
Equipment that will be included but is not setup yet.
-Volume sensors
-Status lights/buzzer/volt meter on the control panel.
I would like to get $2500 PM or email me for more details if you are interested ([email protected])
I started this project earlier this year and is 90% complete. It is based on this setup here https://www.oscsys.com/projects/brewtroller/system-design/recirculated-mash-2-tier
The kettles are all 18 gallon, EVERYTHING is stainless steel/silicon tubing This is a 50amp setup and can run both 5500 watt heating elements for the boil kettle and HLT at the same time. Pumps are chugger, and the chiller is a therminator. I have only ran 2 batches through this setup in its previous state.
Equipment that will be included but is not setup yet.
-Volume sensors
-Status lights/buzzer/volt meter on the control panel.
I would like to get $2500 PM or email me for more details if you are interested ([email protected])