lakedawgs
Well-Known Member
I want to move my setup to the basement but don't want to go with all the controls and such that I see on a lot of the electric setups, yet. Right now, as funds are limited, I just want to get brewing indoors, controls will come later.
My plan is to tap in to existing water lines, install a kitchen range hood venting out a basement window and have an electrician buddy put in a 30a breaker and run the line to the brew area for the 4500watt element. A have a double wide utility sink I can use and currently have a brew rig holding my cooler mash tun and boil keggle.
Just starting to get ideas on paper but what else would you want? Remember I am not going to bling it up yet, just need to economically and safely get started. Fun stuff will get added later.
Thanks much
Lakedawgs
My plan is to tap in to existing water lines, install a kitchen range hood venting out a basement window and have an electrician buddy put in a 30a breaker and run the line to the brew area for the 4500watt element. A have a double wide utility sink I can use and currently have a brew rig holding my cooler mash tun and boil keggle.
Just starting to get ideas on paper but what else would you want? Remember I am not going to bling it up yet, just need to economically and safely get started. Fun stuff will get added later.
Thanks much
Lakedawgs