Taking the "tires" off our 90 ton Shay steam engine, once re-profiled in our wheel lathe, they will be replaced and the engine reassembled, hopefully in time for running season 2012!
Cass Scenic Railroad State Park, Cass WVa
We're also re-flueing our 1905 80 ton Shay 5, making new line shaft bearings for the 11 and the Big Six (1945, 150 ton) our other engines are only in need of general maintenance and the yearly fed boiler inspection. 80 ton Shay #2 is still undergoing a boiler rebuild and wont be running for at least another year or two.
Cass Scenic Railroad
Cass Scenic Railroad State Park, Cass WVa
We're also re-flueing our 1905 80 ton Shay 5, making new line shaft bearings for the 11 and the Big Six (1945, 150 ton) our other engines are only in need of general maintenance and the yearly fed boiler inspection. 80 ton Shay #2 is still undergoing a boiler rebuild and wont be running for at least another year or two.
Cass Scenic Railroad