NoahBeach
Well-Known Member
Awesome... Thank you so much for all the images and info! I think you have just completely changed the design of my upcoming brewstand... I batch sparge now and love it but have been toying with the idea of fly sparging now that I have a 2nd burner. I too only have 1 pump and someday (when the rugrats are older and I have more time to brew) will likely get another pump, so single tier is preferred for future expansion.
I have the same water filter as you, and have been planning on plumbing some PVC to fill my HLT as well.
I love the setup with all the thermocouples and the RPi as well. Definitely will be on my To Do list.
I've been looking all over for short runs of the yellow gas tubing, but can't find it anywhere? Where'd you get yours?
Thanks again for all the ideas!
No problem at all, glad to share info! I hear you about the rug rats, I only have one but he's 19 months old and gets into everything. Brewing is either done very early in the AM or starting around 8PM when he goes to bed, either way I'm tired.
As far as the gas tubing, these are the ones that I got. The picture makes them look like 6" long, but they are 18". They are advertised at 1/2" FIP to 1/2" MIP but they are adapted to that. The actual tube has 3/8" female flare on both sides which was perfect for me, left one side 1/2" MIP to screw on to my ball valve from manifold and the other side as 3/8" flare which connected to the oriface on the burner. They are 1/4" ID, which I was worried about at first, but so far I have had no problems on high pressure LP. I do have plans to eventually convert over to NG (everything else in my home is NG), but I'll cross that bridge when I get there.
Last edited by a moderator: