I am getting together the parts list for my single tier brew system. RIMS system, electric for HLT and MLT, propane for the Boil kettle. Did I miss anything on the list, and please give me your thoughts on the best source for any of the parts listed.
Steel bars for structure
4 casters w/ locks
3 Kegs
False bottom for MLT
Pick up tube for boil kettle
Sparge arm for recirculating (submerged)
220V heating element for HLT
110V heating element for RIMS
control box
2 PIDS
2 SSR
4 switches
4 LED indicator lights
Various wires and strips for control box
Pump
6 male disconnects
2 female disconnects
6 Ball valves
1/2 re-inforced hosing
What did I miss? And any hot tips of money saving sources?
Steel bars for structure
4 casters w/ locks
3 Kegs
False bottom for MLT
Pick up tube for boil kettle
Sparge arm for recirculating (submerged)
220V heating element for HLT
110V heating element for RIMS
control box
2 PIDS
2 SSR
4 switches
4 LED indicator lights
Various wires and strips for control box
Pump
6 male disconnects
2 female disconnects
6 Ball valves
1/2 re-inforced hosing
What did I miss? And any hot tips of money saving sources?