bstacy1974
Well-Known Member
How it started.
Halfway through.
Almost there.
Passed a 7 gallon hot water leak test.
Drained it down to 3 gals that will sit overnight, just to make sure the bulkheads are holding.
Tomorrow will be pickup tube install, wire the element, solder the RTD plug.
A light scrub with bar keepers friend then test fire!
Halfway through.
Almost there.
Passed a 7 gallon hot water leak test.
Drained it down to 3 gals that will sit overnight, just to make sure the bulkheads are holding.
Tomorrow will be pickup tube install, wire the element, solder the RTD plug.
A light scrub with bar keepers friend then test fire!