highland_brewer said:200+ sq ft of tile for the brewerey
Got my sink all assembled so I could locate where the upper brace for the sprayer needs to be.
Looking good so far...so what is your time split? I'm guessing 50-50 between actually working and stumbling around Lowes looking for and then deciding on what to get.
Looking good so far...so what is your time split? I'm guessing 50-50 between actually working and stumbling around Lowes looking for and then deciding on what to get.
Thanks guys... Going to try and lay some tile tonight after work.
I have been accused by a poster... *G-Spot*... of having some day laborers work in the basement while I am at work... He may be removed from the guest list!!! LOL
the ability to adapt to your plan NOT going according to plan!!
i think that is the first plan of every project...murphy is lurking and the only way to beat him is multiple unplanned trips to lowes.