ok so some more progress was made yesterday. i finished drilling the last 2 holes, one for the whirlpool port on the BK and the second on the MLT so i can attach my sparge arm (i think my harbour freight step bits are ready for retirement, 6 keggles to date). Once that was done i plumbed the whirlpool port (brass for now, will be replaced with SS soon, ya know, keep it all BLING! lol), and attached the sparge arm. I also wrapped the MLT in armaflex to increase heat retention. Now all thats left to do is JB weld the elements into their respective PVC couplers and then test the system out to make sure everything works (unlike last time). I will be reusing my old control panel so no need to do ant work there. Hopefully i will be brewing on Monday



