SkunkFunkk
Member
- Joined
- Apr 17, 2019
- Messages
- 10
- Reaction score
- 2
Hey guys,
I am having troubles raising the temperature in the mash tun when i want to mash out
I use a 3 x 50gal kettles HERMS system with 2x5500w elements in the HLT and BK and,
I have to raise the temperature in my HLT to 185/190 to get my MT temperature up to 170, then i have to wait a little bit so my HLT cool down and then fly sparge at 170....
Dont you think i should be mashing out in the BK and start fly sparging at 170 whenever my HLT is ready for it ?
This could reduce my brew day by an hour since I have to wait for my wort to reach 170 in my MT and then wait for the HLT to get from 185 to 170...
Thank you for your time
Ben
I am having troubles raising the temperature in the mash tun when i want to mash out
I use a 3 x 50gal kettles HERMS system with 2x5500w elements in the HLT and BK and,
I have to raise the temperature in my HLT to 185/190 to get my MT temperature up to 170, then i have to wait a little bit so my HLT cool down and then fly sparge at 170....
Dont you think i should be mashing out in the BK and start fly sparging at 170 whenever my HLT is ready for it ?
This could reduce my brew day by an hour since I have to wait for my wort to reach 170 in my MT and then wait for the HLT to get from 185 to 170...
Thank you for your time
Ben