benbradford
Well-Known Member
I just got everything that I need to add a 240v sub panel, and discovered I might have a problem.
There are only 2 wires coming in from the meter.
1 goes to the nuetral bar, and the other goes to the right side of the breaker bar, but then is jumped to the left side of the breaker bar. The breakers only use the left or right side with the exception of a space in the bottom that could be a two pole breaker spot that attaches to both the left and the right.
Struggling with the fact that this house was probably built in the 20's and may only have 120.
There is no 2 pole breakers on the panel.
The dryer is a stacked 120v.
Gas everthing.
I could take a picture, but would be a pain to make it helpful(pull breakers)..
There are only 2 wires coming in from the meter.
1 goes to the nuetral bar, and the other goes to the right side of the breaker bar, but then is jumped to the left side of the breaker bar. The breakers only use the left or right side with the exception of a space in the bottom that could be a two pole breaker spot that attaches to both the left and the right.
Struggling with the fact that this house was probably built in the 20's and may only have 120.
There is no 2 pole breakers on the panel.
The dryer is a stacked 120v.
Gas everthing.
I could take a picture, but would be a pain to make it helpful(pull breakers)..