jacobitti
Active Member
I have a newbie question regarding the strike water and the mash temp. My recipe calls for 20qts of water to be added to my mash tun at 174 degree. Then I am to steep the mash for 60 mins at 156 degrees. I have a SS Brewtech Insulated mash tun and my question is: once I add in the grain I assume the temp will fall, but not sure how much; do I wait until the temp is at 156 and then start the timer, or do I do I start out at what ever temp I get once I mash in and go from there?
Thanks in advance for any insight.....

Thanks in advance for any insight.....
