• If you have bought, sold or gained information from our Classifieds, please donate to HomeBrewTalk and give back.

    You can become a Supporting Member which comes with a decal or just click here to donate.

Oregon Electric Brewing set up.

Homebrew Talk - Beer, Wine, Mead, & Cider Brewing Discussion Forum

Help Support Homebrew Talk - Beer, Wine, Mead, & Cider Brewing Discussion Forum:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

Bobbybob

Supporting Member
HBT Supporter
Joined
Dec 5, 2012
Messages
256
Reaction score
57
Location
Portland
So I started building an three pot electric brewing set up about 2 months before my first child. Well that was almost 5 years and another Kid ago so I am going to sell the majority of it. This was a DIY set up from ebrewsupply.com. It was the last non-stainless box that they cut. It is a 50a two pid 2 element system. I would love for a local pickup but that am willing to ship with buyer paying the cost of course.
BCA3E736-120E-4BE2-B5A8-6B3BDDC596CF.jpeg
4FB23737-D1ED-4A58-9505-2E0BD06C9158.jpeg
774F01DD-E32A-415F-B8AB-61C3300CDA21.jpeg

Everything is done except the therm’s are done. I have the cords for the therm probes too.
B204687F-246C-4562-A242-2AF4BDD6BB84.jpeg
Cover fabric for the temp prob cable, and some leftover wire (I am an electrician I used some of my own).I will take $650 for the control panel. It has never been fired up so buyer will need to do testing to be sure.
26083E26-6D3E-409D-A725-46F654C7BE6E.jpeg
EC1D6340-67F3-4506-9A73-49901EE9CB1F.jpeg
Thirty gallon pot with tri-clover firings, false bottom, two valves one with a three way and a temp probe. This was going to be my brew kettle. $250 for everything pictured in the kettle.
56D429DE-51FC-49C5-8405-CB922AE1DE3C.jpeg
99A07E35-8932-4402-951D-CC7DE9CC6CD5.jpeg
79D18829-6FF1-4234-8700-3D16EF2B1F87.jpeg
This was to be my mash tun. A 26 gallon pot with false bottom several dip tube options tri-clover fittings. $250.
56D429DE-51FC-49C5-8405-CB922AE1DE3C.jpeg
Also pictured is a 50’ 1/2” stainless HERMS coil set up to to be punched thru the lid of of a kettle. With the compression fittings I will take $75.
 
I am interested. I'd need to ship it though. Any idea what shipping would be on those things? 30188

*Edit Sorry I wasn't clear. I am interested in the kettles.
 
I am interested. I'd need to ship it though. Any idea what shipping would be on those things? 30188

*Edit Sorry I wasn't clear. I am interested in the kettles.
I will see what it cost when I get home , if I was thinking I would have weight them before.
 
Each of them weighs ~40 pounds usps puts it at $196 and change each. That is with everything in the pictures in them.
 
Last edited:
Thanks for checking that out. Wow. The shipping cost really add up. I am going to bow out, but good luck with the sale.
 
Well after a lot of drama this is back on the market. Thems are installed. 500 for the control panel, plus shipping if needed. 200 per pot with the gear pictured, plus shipping. Just a note the shipping cost form west coast to east coast is very expensive, north south is less so not sure why.
 
Well after a lot of drama this is back on the market. Thems are installed. 500 for the control panel, plus shipping if needed. 200 per pot with the gear pictured, plus shipping. Just a note the shipping cost form west coast to east coast is very expensive, north south is less so not sure why.
What would shipping be on the panel to 49534
 
30 gallon pot with pictured gear sold, Congratulations Barlee. Still have a 26 gallon pot w/gear (200), and a 50 Kal clone panel (500). Also bump.
 
Hey Bobby. Interested in the panel if it is still around. Not Portland local, but Oregon local and need to make a run to Astoria to get some other gear.
 
A much appreciated thanks to Bobby who was willing to work out a price for someone just starting out on their electric brewing journey.

I'm super excited to migrate from house-fire to electrocution as my biggest homebrew risk. ;)
 
Tempted on the 26gal and coil setup. Might take me a couple weeks to put the dough together though.
 
Back
Top