Pictures of the current configuration...
As everything sits inside it tonight. I'll be able to place another 3 gallon keg on the shelf, once the bottles have been either moved or contents consumed.
Manifold secured to the inside wall (left side) of the fridge...
Shot of the fridge, CO2 tanks, and primary fermenters (on the left, bottom is a 50L, then a 1/4 bbl/pony keg, then a 25L on top) and two of my aging kegs to the right. Plus two empty 3 gallon ball-lock kegs in front.
Better shot of the kegs and CO2 tanks...
From the left: 20#, two 2.5#, 20oz with pin-valve regulator, plus spare 20oz, and 5# that's connected to the bulkhead in the right side of the fridge. All CO2 tanks are currently full. The one connected to the manifold is still essentially full (down a hair). Same 3 gallon kegs as the previous picture.
I'm thinking that I'll attach the drip tray with magnets, as someone else did (keezer build in an updated thread earlier today). That way I won't need to worry about changing it later (and having holes to fill).