• Please visit and share your knowledge at our sister communities:
  • If you have not, please join our official Homebrewing Facebook Group!

    Homebrewing Facebook Group

Building a new system - Need some help

Homebrew Talk

Help Support Homebrew Talk:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.
Garyr2973 said:
Single gang boxes are 2"x4". Double gang boxes are 4"x4". Make sure they are weatherproof boxes.

Thanks! I will start buying the element items.

Is there a running list of what items are needed for the control box?
 
The list of what's needed for the control box will vary depending on what you want it to do. Kal (www.theelectricbrewery.com) has a great list of what he used in his panel. I built my panel different than his and likely you will build yours different to suit your specific needs and desires. The basics will remain mostly the same though - PIDs, SSRs, Contactors...
-Kevin
 
Kals design is cool for the weldless connection to the kettles. I would recommend single gang boxes though. The two gang boxes are annoyingly big and if you're not careful, it is easy to mount them so they hang below the keggle bottom. If you try to make sure they don't hang too low, it is easy to mount the elements too high and you will not be able to use them for a 5gal batch.

I like the idea of the single gang boxes. Any downside to doing it that way?
 
Kals design is cool for the weldless connection to the kettles. I would recommend single gang boxes though. The two gang boxes are annoyingly big and if you're not careful, it is easy to mount them so they hang below the keggle bottom. If you try to make sure they don't hang too low, it is easy to mount the elements too high and you will not be able to use them for a 5gal batch.

Single gang has half the room to work in so it's a bit tight for wiring but that's what I did. Worked fine.

Sweet! Buying the parts today!!!
 
So electrical question here.

If my dryer outlet is wired to a 2 pole 30 amp breaker, would I be able to swap out for a single 50 or have to run new wire?

Since I am going to use 2 5500 watt elements and 2 pump, I need the 50 amp breakers right?

Thanks.
 
You need to match your breaker and wiring. Just popping in a 50A breaker in place of a 30A breaker means you get to burn your house down vs. Brewing ...
 
BadNewsBrewery said:
You need to match your breaker and wiring. Just popping in a 50A breaker in place of a 30A breaker means you get to burn your house down vs. Brewing ...

Yea. After I posted the question, I did some research. I need to find out if I have to get a permit from the city to do this.

Really would rather not burn my house down.
 
BadNewsBrewery said:
You only need a permit to do it "legally" but burning your house down is universally considered a bad idea.

Ha!!!

So talking with a buddy who is building his own e-brewery suggested I use a 60 amp breaker. Can you still use a Spa Panel with the 60 amp?
 
BadNewsBrewery said:
I run a 60a breaker in the panel and a 50a spa panel. No issue there.

Would that allow both 5500 watt elements to be on at the same time? I know they wouldn't be running at full capacity the whole time.
 
Im sure someone will correct me if i am wrong but i believe on=on. If you run the element at 40% power, it is on at 100% power, 40% of the time.

My kal control panel seems to max at about 22.5 amps.
 
You do not need correcting. With a PID - on is on. The PID controls temperature by varying the time the element is on. PWMs modulate temperature by actually controlling the power to the element and altering its output. That being said, depending on how you have it set up you may not be running both elements at the same time, and even if you are probably not a whole lot. Not an excuse to use under-rated equipment, just a consideration. Though I recall someone building a system to power to 5500W elements off a 30A system by having some type of microprocessor controlled switching that ensured that when one element was on, the other was off, switching back and forth - pretty impressive.
 
Crescent Mountain Brewery.jpg

Here is what I am beginning to think for my control panel.

Any suggestions? Thanks to Kevin for all of the help. I am really starting to understand how it all works.
 
Are there three alarm buzzers? You are aware that you can wire all of your PID alarm circuits to a single buzzer, yes?
 
The SWA-2451 has a reset button for the timer. With the SYL-2352s and others you would actually have an alarm on/off switch if you wanted anything. I haven't brewed with the setup yet so I couldn't tell you if there'd be any value to turning off your alarm - I'm of the opinion that if I have an alarm, it's there for a reason and turning it off defeats that reason.

As for having 3 alarm buzzers - I did it that way. If I'm brewing back-to-back, or using one of my PIDs for the timer (SWA-2451) I would like a separate buzzer to tell me if I hit temperature or hit time, and what vessel it's from. If you're only doing one activity at a time and not using a timer, then one buzzer would probably make sense.

One consideration is an LED to indicate when the element is on. It's not required, and the PID should have a small indicator light, but it could be helpful for telling quickly which vessel is heating and which isn't, or for seeing how often your element has to fire to maintain a certian temperature. You'd need one for each element, wired to the contactor output in line with the receptacle.
 
I'll switch to the SWA-2451 and remove the resent buttons for the PIDs. I like having an alarm for each PID.

One thing, the SWA-2451 does not have an SSR built into it, right? So I would need an SSR for each one.

The green LED on my controller is to tell me which element is on. Would I need a separate switch as well??
 
I may not have been clear - the SWA-2451 has an OPTION for a reset button. As in, if you want to reset the timer on the 2451, you can use a reset button. The SYL2352 doesn't have anything to 'reset' so having a button does you no good. Sorry to not be clear on that.

None of the PIDs come with SSRs built in. You need one SSR for every element you plan to turn on / off.

If your green lights are just LED indicators, how do you turn one element on or off? Say you only want to be heating the BK and cleaning the HLT - how are you going to turn off the power to the HLT element?
 
Wouldn't the PIDs control the power to the element?

The PID doesn't generate enough current to run the element, so it controls an SSR that does. The contactor between the SSR and the element allows you to be sure that the element is truly off when you want it to be, given that SSRs can leak and can fail closed.

SSRs and contactors are both relays. The SSR is capable of frequent switching, but has the leakage and fail closed issues. The contactor is not made to switch as fequently as the PID would have it do, but a normally open contactor will be open when you expect it to be. Together they give you what you want, PID control over the element, and a manual switch so you can make sure the element is off when you want it to be.
 
Together they give you what you want, PID control over the element, and a manual switch so you can make sure the element is off when you want it to be.

This. Both do essentially the same thing (use a small current to open or close a switch) but they do it in different ways, and work best in tandem. Confusing yet? :drunk:
 
This. Both do essentially the same thing (use a small current to open or close a switch) but they do it in different ways, and work best in tandem. Confusing yet? :drunk:

I thought I was understanding everything, now I am really confused.
 
So what kind of switch would I need to be able to heat water to clean with in the HLT while the BK element is going? Or would I not have enough amps to do this?
 
So what kind of switch would I need to be able to heat water to clean with in the HLT while the BK element is going? Or would I not have enough amps to do this?

What did you decide to do for amperage? I believe earlier in the thread you said you had 30amp 220V. If that's the case, you can only run one 5500W element at a time. If you do upgrade to 50 or 60amp service, you have more options for running elements simultaneously.

I really suggest you read through and understand Kal's build at www.theelectricbrewery.com. Even if you want to go in a different direction, that is an invaluable resource for understanding how these components work, and will put you in a much better position to build a safe and effective control panel.
 

Latest posts

Back
Top