Mine took longer than 10 days. As I mentioned above, I went to secondary after 11 days (SG = 1.013). At 17 days, I was at 1.009, so I must be about ready to rack. I don't think I'll cold crash as I add speiss(?)/gyle and will probably bottle 3 pints when I keg. That means 3 rackings including the racking to secondary.
I'll probably add a tiny amount of sugar to each bottle - though I've never done it that way and I'm not sure how much to add. I guess I'll just look for the smallest measuring spoon amount.
[Edit] I just did the math and 2/3 Cup sugar per 5 gallons is about 2.4 tsp/Pint. So depending on how much I think the gyle will contribute to the head, I'll probably add about 1 tsp of sugar per Pint bottle.
I'll probably add a tiny amount of sugar to each bottle - though I've never done it that way and I'm not sure how much to add. I guess I'll just look for the smallest measuring spoon amount.
[Edit] I just did the math and 2/3 Cup sugar per 5 gallons is about 2.4 tsp/Pint. So depending on how much I think the gyle will contribute to the head, I'll probably add about 1 tsp of sugar per Pint bottle.