Getting ready to build mine soon. 220 for the 7CU freezer; 645 for three kegs, three perlick chrome faucets, 5# tank, dual body regulator w/ dual pressure guage, thee ball lock hookups (one sankey adapter), temporary beer tap on one line, one three-way manifold for serving, one two-way manifold for carbing, and all the other gizmos, gew-gaws, and gadgets to make beer go in and come out; 28ish for the external temp controller, and I still have to buy the wood, insulation, paint, etc to make it presentable. So what close to a grand /sigh.