You'd need at minimum a 220v 30amp circuit, preferably with a GFCI breaker. If you wanted everything in the same control box, you'd probably want larger than a 30amp circuit. Additionally, if you're using one in a HLT, or want to control boils, you'd need PIDs, SSRs and thermocouples.
Go check out this great resource maintained by Kal from the forums: