RIMS setup 120v 15a control box for a 1500w element, PID, chugger pump, e-stop.
I have a 50ft spool of 14awg, and am planning to install fuses to:
.25a PID
1a E-Stop
2a Pump
12.5a Element
Other than wiring the line in and the element, is it worth picking up lower gauge wire (like...