I have been fermenting in a 13.5 gal Vittle Vault for a couple of months now and decided to upgrade it so I can transfer to keg with CO2.
I had some spare camlock fittings and pipe fittings so I took a dust cap for camlock and had a buddy weld in the thermowell. After fermentation I take out the thermowell and put in a barbed camlock that will be connected to the CO2.
The Dip tube is 1/2" SS from mcmaster-carr. I will use barbed camlock with hose to transfer to keg.
I got the bulkhead fittings from US plastics.
I had some spare camlock fittings and pipe fittings so I took a dust cap for camlock and had a buddy weld in the thermowell. After fermentation I take out the thermowell and put in a barbed camlock that will be connected to the CO2.
The Dip tube is 1/2" SS from mcmaster-carr. I will use barbed camlock with hose to transfer to keg.
I got the bulkhead fittings from US plastics.